A formwork supervisor shall be appointed to supervise the construction, erection, alteration, or dismantling of any formwork structure on a worksite.
- To ensure safe erection, all formwork components must be properly seated, connected, braced, and tied during the process.
- After completion, inspect the formwork structure to ensure alignment with the design and drawings.
- Immediately report any safety concerns discovered during inspections