Job Responsibilities:
- Checking on Rio Panel (panel design, internal wiring, panel cable entry, surge arrestor, signal isolator, signal barrier, PLC, Rio panel schedule)
- P&ID understanding in cable installation, instrument location/routine, cable schedule, cable termination drawings and calculation
- Work out panel design (with Fibre optic interface panel (Fibre optic panel), Field fibre optic termination panel (Fibre optic panel) and General arrangement (panel design), UPS Distribution Box, Junction box)
- Present and to design the cable routine
- Present and to design the ICA Cabling – instrumentation cable & Communication cable
- Present and to design the UPS cabling from main UPSDB and Field UPSDB
- Perform the process function of Plant Automation Network (PAN) and Plant Subring Network (PAN Subring) Centrifuge
- Perform the non-process function of Power Monitoring System (PMS) Network and FFOTP Network.
- Perform Electrical Signal list Hardwire signal list, Power Monitoring System (PMS) drawings, Local Control Station (LCS)
- Perform Site work for Cable tray sizing, Cable duct issues – GWRF area, Cable Support System Beneath Raised Floor
- Perform any other duties as assigned by Management.
Requirements:
- Candidate must possess at least a Bachelor's Degree, Post Graduate Diploma, Professional Degree, Master's Degree, Engineering (Electrical/Electronic) or equivalent.
- Preferably Executives specializing in Engineering - Electrical, Maintenance/Repair (Facilities & Machinery) or equivalent.
- Understand for MCC, MDB, LVSG, HVSG, Transformer
- Basic knowledge on Bentley Software – 3D modelling
- Motivated, team oriented, communicative and able to work under pressure
- Willing to work at Tuas area (Transportation provided at specific location)
- 5.5 days work
- Salary Package will commensurate with experience