Description:
Mechanical Work
- Supply, Installation and Commission (SIC) of brine supply system including pumps and pipe works from TDP to RNDF.
- SIC of screened seawater supply system including pumps and pipe works from TDP to RNDF
- SIC of wastewater discharge system including pumps and pipe works from RNDF to TDP.
Electrical Work
- Modify of 22kV switchgear spare panel to transformer panel at TDP’s 22kV Substation.
- Supply & lay 22kV transformer cable from TDP to RNDF. It includes excavation and reinstatement of roads and reinstatement.
- SIC of a containerized electrical house, from the product range of the manufacturer to house both the new 2 MVA transformer and Low Voltage Switchgear (LVSG)
Requirement:
- The candidates shall have about 3 years of relevant engineering experience as an RTO in the supervision of construction works preferably in water and/or wastewater infrastructure projects, and about 2 years or equivalent, have the necessary certification from BCA for construction supervision works.
- They shall be able to work irregular hours when the need arises.