Resident Technical Officer (Mechanical & Electrical)
- To carry out site supervision and inspection of mechanical and electrical works including co-ordination with contractors and users so that works are carried out safely and accurately. It also includes any off-site manufacturing as instructed by the Engineer so as to ensure that works are constructed to required quality and accuracy.
- To monitor progress of the works on site and at any off-site manufacturing facilities and report delays immediately.
- To ensure that works are only carried out strictly within the stipulated time and/or at other time directed by the S.O. or other designated CAAS officer.
- To provide standing supervision as and when directed by the S.O. and/or by the Engineer/Architect, CAAS Engineer/Representatives.
- To enforce site safety and other measures to control dust, noise and vibration caused by the Contractor’s works.
- To maintain proper site filing system and updated records of all works done, including records of all activities, daily manpower, tests, inspections, status of works, safety, material delivery and equipment on site, labour, day works, site diary, provisional quantities, etc. according to ISO requirements.
- To check all drawings (including shop drawings) and sketches to verify and ensure that works are carried in accordance to approved drawings.
- To check that Contractor execute preliminaries items and conform to all requirements as stipulated in the contract.
- To check service routes and Contractor’s setting out and report any deviations to the SO and/or his engineer/architect.
- To check that all works are carried out in a safe and proper manner including temporary supports, protection and isolation of services.
- To verify reports and progress claims submitted by Contractor, including keeping record of all variations/changes as instructed or approved by the S.O.
- To attend to users’ and Contractor’s queries to ensure no disruption and/or disturbance to the operations of Singapore Changi Airport, RSAF Changi Airbase and associated CAAS/CAG premises or Ministry of Transport’s work sites in Changi East.
- To co-ordinate works (including concurrent and advance works) of all contractors and other direct contractors working at the site.
- To maintain record of site supervision’s overtime and any other claims.
- To inspect and ensure works are carried out in accordance to specifications and requirements, including taking and handing-over of completed works.
- To ensure that the Contractor’s workers are carrying out works only at their designated areas as the RSAF Changi Airbase, Singapore Changi Airport, CAAS/CAG Premises or Ministry of Transport’s work sites in Changi East are high security and protected facilities. No loitering and entry to unauthorised areas are allowed.
- To undertake any other duties related to the project as and when instructed by the S.O./Client through the Architect/Engineer.
- To fully complete the supervision of all mechanical and electrical works carried out by the Contractor. Though the mechanical and electrical is envisaged to be completed in about 3 months’ time, the supervisor will be required to continue his duties in the event of any extension of time granted.
Resident Technical Officer (Mechanical & Electrical)
- Diploma/Degree in Mechanical or Electrical Engineering from a recognized tertiary instituton;
- A registered Resident Technical Officer with Institution of Engineers Singapore (IES) or Association of Consulting Engineers Singapore (ACES) with valid practicing certificate;
- Minimum 5 years of relevant site supervision experience as a Resident Technical Officer on local projects;
- Experience in coordination and supervision of M&E installation works of critical infrastructure projects and projects involving additions and alteration works is preferred; and
- Resident Technical officer should be Singaporean.
Scope of Works
Air-Conditioning and Mechanical Ventilation Services
- Replacement of Air-Cooled Chiller Plant
- Replacement of Water-Cooled Chiller Plant
- Replacement of Condenser Water Chemical Treatment System
- Replacement of Air-Cooled Chillers
- Replacement of Chiller Plant Heat Exchanger
- Installation of Refrigerant Leak Detection System Chiller Plant Rooms
- Refurbishment of Existing AHUs for Backup prior to replacement
- Replacement of Air Distribution System (AHUs, CRAC Units, Chilled Water FCUs and DX Units)
- Installation of New Chilled Water PFCU at Equipment Room
- Replacement of Air Handling Units
- Replacement of Chilled Water FCUs at Staff Lounge
- Installation of New Pre-Cool Chilled Water FCUs Staff Lounge
- Replacement of Mechanical Ventilation Fans
- Replacement of Exhaust Fans to Ancillary Building Transformer Room
- Installation of New Mechanical Ventilation Fans to Equipment Rooms
- Replacement of Other Mechanical Ventilation Fans
- Installation of Fresh Air Supply
- Installation of Indoor Air Quality Display
- Replacement of Hose Reel Pumps
Fire Protection Services
- Replacement of Hose Reel Tank & Pumps
- Replacement of Non-Addressable Fire Alarm System to Addressable Fire Alarm System
- Replacement of Existing Halon/Argonite Fire Suppression System to Clean Agent Fire Suppression System
- Improvement Works to Existing Dry Risers
- Extension of Fire Sprinklers Coverage
- Addition of Smoke Detectors Coverage
- Replacement of Sprinkler Pumps and Combined Sprinkler/Hosereel Tank
- Replacement of Hose Reel Pumps
- Replacement of existing Fire Alarm Panel to Addressable Fire Alarm System
Plumbing & Sanitary Services
- Replacement of Domestic Water Booster Pumps c/w Hydropneumatics Tanks
- Replacement of Domestic Water Tanks
- Installation of new NEWater System
- Replacement of Cooling Tower Make-Up Water Tank and Pumps
- Replacement of Irrigation Water Tank and Pumps
- Replacement of Domestic Water Tanks
- Tiling works to Domestic Water Tank & Decontamination Tank at Basement Mezzanine
- Replacement of Domestic Water Booster Pumps c/w Hydropneumatics Tanks
- Replacement of Decontamination Water Pumps c/w Hydropneumatics Tanks
- Installation of Water Sub-meters
Building Management System
- Installation of Chiller Plant Optimization Program
- Replacement of BMS
- Electrical Services
- Replacement of 2 nos. HT Switchboard
- Replacement of 2 nos. Power Transformers
- Replacement of 2 nos. Standby Generators System
- Replacement of 3 nos. Mobile Generator Interfacing Panels
- Replacement of 22kV cables from HT Switchboards to Transformers
- Replacement of LV cables from Transformers and Generators to LV Main Switchboards and Standby Switchboards
- Replacement of Main Switchboards (MSBs), Emergency Main Switchboards (EMSBs) and Standby Switchboards (SBs)
- Replacement of Sub-Switchboards (SBs), Manual Transfer Switch (MTS) Panels, Distribution Boards (DBs) and Over-ground Box (OG Box)
- Replacement of Air-cooled Chiller Plant MCC
- Replacement of 4 nos. standby generator fuel pumps
- Installation of new digital power meter for Main Switchboards and Distribution Boards
- Replacement of fluorescent lighting to LED lighting
- Replacement of all sub-main cables
Lift Services
- Lift replacement for Lift System
- Lift modernization for Lift System
Monday to Friday Excluding Public Holiday
8.30am to 5.30pm
Every Saturday Excluding Public Holiday
8.30am to 12.30pm
contact : [email protected]