- Involved in bored pile and D-wall works.
- Able to set up and operate Trench Cutter and Grab Machine operator
- Handle bored pile excavation by using BG 36 (Rotary Drilling Rig) machine with Oscillator(casing installation machine).
- Performing routine and basic machine maintenance.
- Control the verticality of excavation work.
Crawler Crane Certificate
Minimum 5 years relevant working experience construction industry, specifically in ground improvement.