ร To Ensure Piping Fabrication, Installation and Erection works in compliance with Project
Specification.
ร To identify risks and Hazards associated with the Piping works and prepare related Risk
assessment and work Method statement.
ร PreโJob Briefing and Tool Box Talk to workforce prior to start the work activity.
ร To ensure timekeeping are followed by subcontractor workers.
ร To ensure availability of required Engineering drawings, Resources and consumables to carry out
the works.
ร To coordinate with other discipline such as QA/QC, Material Dept., Painting team etc. according
to requirement during the project phase.
ร Ensure valid work permit is available with subcontractor prior to start the work.
ร Ensure site/ shop activity must be highlighted in daily PSCC meeting and communicated to all
parties.
ร Ensure proper housekeeping to be carried out by subcontractor after completion of job.
ร To participation in line walk and prepare punch list prior to complete piping Reinstatement
activity.
ร To ensure Punch list liquidation and action by subcontractor on required punch point on priority
basis.
REQUIREMENTS
ร Ability to read and understand the piping isometric and general arrangement drawing.
ร Good knowledge on Piping Fabrication, installation and Erection methodology.
ร Having good knowledge on Piping and Instrumentation Diagram (P&ID) and PFD,
ร Ability to assign work scope to subcontractor Workforce and monitoring of work activities at site.
ร Technical ability to understand the problem and ability to resolve with proper solution accordingto the project specification,
ร He has good knowledge on carry out Piping Walks, summarize detail punch list and preparingaction plan to complete the assigned work on time.
ร Hard working and committed to work towards assigned task and result oriented as pipingsupervisor.
ร Ability to Review Piping Test Packages and plan for carry out related inspection and QC clearancefor final walk.
ร Ability to co-ordinate with client and good monitoring and follow up at site to get the progress.
ร Well Verse with the Safety Requirement during execution of piping works.
รReady to Work night shift.