1. ACMV System Design.
2. Attend site Technical and coordination Meeting.
3. Liaise with Owner, Main contractor, Architect and M&E Consultant.
4. Site coordination and Technical Advice.
5. Project trade installation advice.
6. Heat Load calculation.
7. Piping and Ducting Pressure Drop Calculation.
8. Chilled water design and Calculation.
9. Chilled piping design.
10. ACMV Equipment Selection.
11. ACMV Equipment such as Chiller, AHU, Cooling Tower, DX System, MV fan and Pumps Design, selection and preparation of Technical Data sheet.
12. System Technical, control philosophy and control logic writeup.
13. Project Deliverable Schedule and Submission.
14. Bill of Quantity.
15. Tender Preparation.
16. Resourcing, Liaising, coordinating and procurement of equipment from local and oversea supplier.
17. ACMV System Testing and commissioning.
18. Project handover Respective parties.