§ Plant Design using SP3D and Drafting.
§ Preparation of piping Layout drawing, Isometric drawing from piping Layout for fabrication and erecting work.
§ Checking of isometric as per Piping layout, Line List, P&ID & Piping Specification.
§ Co-ordination with Client, vendors and internal disciplines for approval, Cad & Isometric release to site work.
§ Modification of P&ID as per final designed Isometrics.
§ Preparation of Bulk MTO using P&ID, Piping Material Specification and Valve Datasheet
§ Stress Analysis part using CAESAR—II including identification of stress critical lines, preparation of stress Critical Line List.
§ Stress Analysis of piping system as per ASME 31.3 thereby ensuring stresses and displacements are within Limit.
§ Flange Leakage Calculation.
§ Analyzing for Wind & Seismic load as per stress design criteria.
§ Slug force calculation.
§ Equipment Nozzle compliance with applicable API, ASME, WRC, Tank nozzle with project specific codes.