• Supervise and monitor the preassembly team. Check that all base plate are set and secure in the right manner with the sleepers.
• Ensure that the sleepers surface are excepted by LTA requirement.
• Supervise the panel assembly team. Ensure that the right rail is being fix before the panel is bring down to the tunnel.
• Co ordinate the loading of the panel to the loco with the lifting team.
• Check on the welding team ensuring the proper measurement for welding have been done on the BRC.
• Follow thru the panel laying team and ensuring that the panel is lay correctly following the drawing.
• Method of statement is to be follow by all workers.
• Involved in the inspection with LTA.
• Prepares daily work activity reports and submit to section manager and senior engr.
• Ensures safety work practices are followed on site by the respective subcontractors
• And reports to the senior engineer and safety personnel for any unsafe practices.